Sun Tower

This masonry rehabilitation at the northeast corner of Sun Tower podium included: dissasembly of the terra cotta to expose corroded column, salvaging and cleaning of terra cotta blocks, scaling and grinding of original steel column to good substrate and treat with epoxy sealant, fabrication of new terra cotta blocks where required, installation of new stainless steel armatures to hold the terra cotta blocks, installation of copper copings, cleaning of all masonry, replacement of window lintels, cleaning, repointing and patch repair of all terra cotta in the project area and repointing of all brick masonry in the project area.